San Francisco, CA
JP Morgan Chase Branch in San Francisco includes interior tenant improvements in an existing building on the ground floor of 188 Spear Street. Technology utilized includes large video monitors, ADA scrim screen, 3 express-banking kiosks, instant issue machine, teller tablet, teller cash recycler, and Chase Private Client accommodations.
- High-volume pedestrian location in downtown San Francisco financial district
- Branch includes 3 CCRs and 2 access bars
- Entry vestibule includes 3 walk-up EBK’s and night depository, equipped with NanaWall
- Exterior illuminated signage approved by local DRC
Similar Projects

WESCOM Credit Union - Riverside
DEB Construction completed a major renovation of the WESCOM branch in Riverside, CA. The almost 3,000 SF facility included new ATM’s, teller counters and financial offices,
Riverside, CA


WESCOM Credit Union -
UCLA Ackerman Hall
WESCOM Credit Union serves as the “Official Banking Partner” for UCLA Campus Life and other UCLA entities. Their mini-branch, designed by Little Diversified Architectural Consulting, operates
Los Angeles, CA

WESCOM Credit Union -
Redlands
The WESCOM branch relocation in Redlands, CA offered a unique opportunity for DEB Construction to work within the City limits of Redlands but within the municipal
Redlands, CA



Large American Bank -
Anaheim Hills
DEB Construction recently completed a major renovation of a large American bank branch in Anaheim Hills, CA. The almost 4,000 SF facility included new ATM’s, teller
Anaheim Hills, CA

Capital One -
Walnut Creek
DEB Construction recently completed construction of Capital One’s new facility in Walnut Creek, CA. The Banking Center includes a Peet’s Coffee for the Cafe/Coffee/Banking ambiance that
Walnut Creek, CA

Union Bank -
Pacific Palisades
The Union Bank branch in Pacific Palisades, CA was a new build out in existing shell space which includes 2 stories of a total of 4,000
Pacific Palisades, CA

Large American Bank -
Warm Springs
This large American bank branch in Fremont, CA was a major renovation project. The space was remodeled to fit all their new HORP specifications. The interior
Fremont, CA

Large American Bank -
Beverly Hills
This large American bank’s branch in Beverly Hills, CA was a full interior renovation consisting of 6,468 square feet. The bank branch space was remodeled to
Beverly Hills, CA

Large American Bank -
Alton Parkway
This large American bank branch on Alton Parkway in Irvine, CA was a 3-phased construction project consisting of 4,550 square feet of interior improvements. The existing
Irvine, CA

Large American Bank -
New Branch | Palm Desert
DEB Construction recently completed a ground-up for a large American bank in Palm Desert. This 5,000 SF one story Branch included new ATA machines located in
Palm Desert, CA


US Bank -
Los Angeles
DEB Construction provided construction of a new high-end space banking center for US Bank in a historical Los Angeles building. Work included abatement, working in an
Los Angeles, CA

JPMorgan Chase Bank -
Rolling Hills Estates
DEB Construction constructed the new ground-up banking center branch with affluent finishes and separate drive-through ATMs on the corner lot previously occupied by a gas station.
Rolling Hills Estates, CA

JPMorgan Chase Bank -
Private Client | Los Angeles
DEB Construction provided tenant improvements for JP Morgan Chase Private Client (CPC) downtown Los Angeles branch. The construction of this new banking center incorporated a Chase Private
Los Angeles, CA

JPMorgan Chase Bank -
Lake Balboa
JP Morgan Chase in Lake Balboa was a 3-phased construction project of interior tenant improvements in an existing building. The existing bank space was remodeled and
Lake Balboa, CA

JPMorgan Chase Bank - Pleasanton
This new JPMorgan Chase branch in Pleasanton, CA includes technology features like: ADA scrim screen in the lobby, teller tablets, 3 express-banking kiosks, an instant-issue machine,
Pleasanton, CA

Farmers & Merchants Bank -
San Clemente
This project, under construction in 2011, is a ground-up 8,800 square foot bank branch. The duration of the project was approximately 9 months. Complete removal and
San Clemente, CA

East West Bank -
Beverly Hills
This 10,000 square foot project was a high-end, interior buildout for East West Bank. The bank is located at a very high-profile corner of Wilshire and
Beverly Hills, CA


JPMorgan Chase Bank -
Irvine
DEB Construction provided tenant improvement construction for this high-end finishes private wealth management space, in a Type “A” high-rise office building without disturbing adjacent tenants. The
Irvine, CA

Citibank -
Menlo Park
DEB Construction renovated the entire branch at this Menlo Park site. LEED Gold certified.
Menlo Park, CA